Permits - Landscape Guidelines
In order to process your landscape
permit the following information must accompany the permit application.
1. "As Built'' final
grade survey that identifies the final grades established by the builder.
This survey is necessary so the Building Department can check the "as
built'' to verify that the grades are in conformance with the engineered
plan of the subdivision. The General Contractor is responsible for this
survey. However, it may not have been available at closing due to wet soils
conditions. That would have restricted the General Contractor from
establishing the final grades. Please secure a copy from your General
Contractor and submit with your permit application.
2. Identify on the plat
of survey location of drainage swales, size of swales and direction of storm
water runoff.
3. Identify on the plat
of survey location of planting areas and distances from lot lines.
Planting area/berms may not encroach into drainage swales. All drainage
swales must be grass - no mulch, rock etc.
-
If grade adjustments are
required as defined on the as-built survey it will be the responsibility
of the General Contractor to grade accordingly. A
landscape permit or irrigation permit will not be issued until grades are
established in accordance with the drainage plans of the subdivision.